OUR FIRST YEAR WITH SUPERBONUS 110%

The Superbonus 110% regarding energy saving interventions has become law on July 17th 2020, published in the Official Journal, n. 77 billconverting Decree-Law n. 34/2020 (certificate of deposit Decreto Rilancio).

How does it work? 
Starting from the current situation it is mandatory to go up two energy labels to use the Superbonus 110%. 
It is also necessary to carry out at least one of the so-called leading interventions.  When the “jump” of energy labels is accomplished and the leading intervention is carried out, it is possible to apply 110% rate even to what is defined as a led intervention. 

Let’s clear the air
Depending on the requesting party leading and led interventions can change. Let’s go into detail: 
 -Apartment buildings
 Leading interventions:
 -Heat insulation: for at least 25% of the dispersing surface
-Heating generator unit replacement with a condensing boiler, heat pump or hybrid – centralised system
 -Anti-seismic interventions
 -Led interventions: 
 -Photovoltaic system
 -Rechargeable batteries
 -Charging stations
 -Doors and windows
 -Shutters and curtains
 -Removal of mobility barriers
 -Single-family buildings

Leading interventions: 
 – Heat insulation: for at least 25% of the dispersing surface
-Heating generator unit replacement with a condensing boiler, heat pump or hybrid – centralised system
 -Anti-seismic interventions
 -Led interventions:
 – Photovoltaic system
 – Rechargeable batteries
 -Charging stations 
 -Doors and windows
 – Blackout and curtains 

Multifamily buildings with functionally independent housing unit
Leading interventions: 

Heat insulation:for at least 25% of the dispersing surface
Heating generator unit replacement with a condensing boiler, heat pump or hybrid – centralised system

Anti-seismic interventions
Led interventions:
 – Photovoltaic system
 – Rechargeable batteries
 – e-car Charging Station
 -Doors and windows
 – Blackout and curtains

Coesa makes things easier, here is our process:
Our goal is to simplify the processes!
For the interventions regarding Superbonus 110% we handle the whole process invoicing the client just once applying an assignment of claim amounting to 110%. 
Superbonus 110% process with Coesa, Decree-Law 34/2020 

The client charges an expert with the certificate of urban planning. The client is only responsible for this document, because it is prior to the Superbonus 110% paperwork. 

Coesa sends to the client the following documents:
 – Pre-inspection, client’s data collection 
 – Planimetry authorization forms to request and download your blueprints
 – Privacy for data management
 – Bilateral work commitment 
The client needs to sign these documents and send them back to Coesa.
Coesa:
 – Sends an expert to the client to start the inspection and to verify the “jump” of 2 energy labels
 – Once the “jump” is confirmed, Coesa sends the results of the energy analysis to the client 
 – Coesa charges the companies to carry out the inspection and controls the estimates, the technical and economic requirements issued by Decreto Rilancio 
The client: 
● The complete management of Superbonus 110% incentive
Coesa:
 – Coordinates the experts, the order of materials and the schedule with the companies 
 ● Coesa’s experts draft the documents and the asseveration required by the Decree: Law 10 /  Construction practices / Security and Coordination plan / Energy Performance Certificate (EPC) pre-intervention and pre-asseveration. Our experts will upload the documents on the revisers’ portal
● When the work is done our experts will draft the post-intervention EPC and upload the documents on ENEA’s portal
Qualified revisors grant a compliance certificate which certifies the existence of the requirements that entitle the client to receive the tax deduction
Case History 
In Coesa we like speaking facts, so we would like to show one of our interventions. 
Intervention’s town: Candiolo (TO) 
Leading interventions
Replacement of air conditioning systems – hybrid boiler with heat pump
Insulation structures
Led interventions
Replacement of doors, windows and shutters
Installation of sun protection systems
Installation of a photovoltaic system
Installation of energy storage systems
Total cost Interventions:
€ 152 445,78
Discount invoice 100%

This is just one of the interventions regarding Superbonus 110% that we have been in charge of during this year.
Would you like to work with us?
We will be happy to accept your request, get in touch with us here!