Superbonus 100 interventions_residential house_02

Previous Next Intervention site: Candiolo (TO) Client: Private citizen Year: 2021 Leading Interventions 1. Replacement of winter air conditioning system – hybrid boiler with heat pump 2. Insulation structure Leading Interventions Leading Interventions 1. Replacement of fixtures and shutters2. Installation of solar shading systems3. Installation of photovoltaic system4. Installation of energy storage system Total cost…

Superbonus 110 interventions_residential house

Previous Next Intervention site: Cavour (TO) Client: Private citizen Year: 2021 Leading Interventions Leading Interventions 1. Replacement of winter air conditioning system – hybrid boiler with heat pump Leading Interventions Total cost Interventions: 1. Window replacement2. Solar shading systems3. Photovoltaic system 4. Energy storage system Total cost Interventions: € 83.550

Relamping and incentives – Town of Leinì (TO) – School_Anna Frank_

Previous Next Client: Town of Leinì (TO) – “Anna Frank” School Client: Town of Leinì (TO) Year: 2019 Leading Interventions Leading Interventions Incentive request for the replacement of indoor lighting systems with LED systems (relamping) – Public Administration Leading Interventions 1.Replacement of indoor lighting systems Total cost Interventions: Total cost Interventions: Incurred cost: € 88.938,84…

Incentives and efficiency BMW dealership – Saronno (VA)

Intervention site: Saronno (VA) Client: BMW Dealership Year: 2019 Leading Interventions Leading Interventions Incentive request for the replacement of heat generators equipped with heat pumps Total cost Interventions: Total cost Interventions: € 125.550 + VAT tax ● Incentive obtained € 80.732,79, equal to 64,3% of incurred costs Method of supply: collection mandate

Residents energy efficiency – Vallo (LC)

Previous Next Intervention site: Vallo (LC) Client: Private citizen Year: 2019 Leading Interventions Leading Interventions Residents energy efficiency – Incentive request for the replacement of heat generators equipped with heat pump systems – Private citizens Leading Interventions 1. Replacement of an oil boiler with a heat pump. Total cost Interventions: Total cost Interventions: € 142.326,42●…

Incentives and efficiency – Primary School_Sanner_ – Town of Robbio Lomellina (PV)

Previous Next Intervention site: Robbio Lomellina (PV) – “Sanner” Primary School Client: Town of Robbio Lomellina (PV) Year: 2019 Leading Interventions Leading Interventions Energy efficiency intervention for “Sanner” primary school in the town of Robbio Lomellina (PV) – Incentive request for the replacement of doors and windows Leading Interventions 1. Incentive request for the replacement…